PileCap Design (only work with browser supporting VBScript like IE4):
(Step 1 of 4)

I_PileCap_350x175.gif (2918 bytes) Note: This web base pilecap design software is of primitive due its nature of technology. For a more impressive pilecap program with full feature, you may visit the SY-Pilecap page, where this software is available for download.
I_01_WholeProgram_256.gif (3591 bytes)
Job Information Column load, dimension and pile load
Pilecap Ref.
Part:
Project:
Designer:
Remarks:
Service load, P = kN
Col. Myy = kNm
Col. Mxx = kNm
Hxx = mm
Hyy = mm
Lxx = (to be determined during analysis)
Lyy = (to be determined during analysis)
d (total) = (to be determined during analysis)
Design basic data Pile point
Pile diameter, D = mm
MAX. Pile working load = kN
Minimum pile spacing = *D
Concrete cover = mm
Pile penetration = mm
Pile deviation allowed = mm
BAR size = mm
Density of soil = kN/m^3
Density of concrete = kN/m^3
Concrete rate = RM/m^3
Steel rate = RM/kg
Min Pilecap thickness = mm
Soil thk. above pilecap = mm
Minimum % of steel = %
Ultimate load factor =
Concrete grade, Fcu = N/mm^2
Steel grade, Fy = N/mm^2
minimum edge distance = mm
Depth increment = mm
LoopBar spacing = mm
LoopBar size = mm
No. X (mm) Y(mm)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20


Ad-here
Contry Height Holding Berhad

SY Perunding Sdn. Bhd. All Rights Reserved. [Privacy policy]  [Term of use]

Address: 16, Jalan SS3/31, 47300 PETALING JAYA, Selangor, Malaysia. Email: syp@po.jaring.my

If encounter any problem viewing this page or there is any comment, please email to us at syp@po.jaring.my

or call us at 603-78774470 during office hour