SY Perunding Logo

Date:4 Sep.

Last update: 28 Aug.2006

Consultancy

I_Bullet_15x15_01.gif (850 bytes) Our profile 
I_Bullet_15x15_01.gif (850 bytes) Project by us 
I_Bullet_15x15_01.gif (850 bytes) Career I_CareSta1_25x25.gif (1086 bytes)
---Engineer & CAD Draftperson recruitment !!---
Technical guideline
Sample of authority requirement and civil design 
General knowledge 
Structure Design (coming up)
More (coming up)
Download ---Try it !!---
Software
SY-Pilecap 
------- Check it out -------
Drawing (coming up)
Excel sheet (coming up)
More (coming up)
Online calculation
Pilecap design according to BS8110 (web base) 
Unit conversion table (web base) 
More (coming up)
Discussion forum
R.C. design and analysis
Civil work
Steel design and analysis
Drafting
More 
Logon to project directory (for project team member only)
Project code:
(New window is created for this link)
Best view with
Project by SY Perunding:
A. Completed project:
  •  
Condominium Development on Bukit Saujana, Johor Bahru (RM135 million; contruction completed in 1996) (110) 
  •  
Factory, Pontian (contruction completed in 1996) (108) 
  •  
Office and Warehouse development, Petaling Jaya (RM 18 million; contruction completed in 1996) (112) 
  •  
2 Storey Office Block and Warehouse cum Process Plant (Factory Relocation Exercise), Shah Alam (contruction completed in 1997) (133) 
  •  
Metro centre, Kuala Lumpur (RM 73 million; contruction completed in 1997) (121) 
  •  
Pendamaran Local Plan Study, Klang (4850 hectares; Local plan draft finalised in 1999) (161) 
  •  
Resort City Bungalow Lots, Petaling (54 acres; contruction completed in 1999) (135) 
  •  
Engine Transmission Factory, Shah Alam (RM 20 million; contruction completed in 1996) (137) 
  •  
Jerteh-Kampung Raja-Kuala Besut, Terengganu Local Plan Study (172) 
  •  
Mixed development with 10 Storey Low Cost, Double-storey Terrace House/shop, Surau, Multipurpose Hall, Store, Elevated RC Water Tank, Mosque, School Reserve, Rawang (RM 121 million) (123) 
  •  
12 Storey Podium Block with 914 apartment units with 6 storey carpark, Kuala Lumpur (RM 80 million) (152) 
  •  
17 Block 5 Storey Low Cost, Pajam (RM 30 million) (130) 
  •  
Industrial Estate Developemnt, Petaling (80 acres, RM 70 million) (120a)  
  •  
Bungalow and terresa developement consists of 23 units bungalow lot with 4 bungalow design and double storey terrace, at Mukim Cheras, Selangor.(154a )
  •  
Mixed Development consists of 10 storey apartment, 5 storey low cost, 5 storey medium cost, 2&3 storey shop office, 2 storey market at Seberang Perai Tengah, Pulau Pinang.(157 )
  •  
Bungalow Lot developement (The Lotus of Mines), at Mukim Petaling, Kuala Lumpur.(160a )
  •  
1 Block 18-Storey Medium Cost Aparment (267 units), 3 Block 3-Storey Shop Office, at Pudu Ulu, Kuala Lumpur (163 )
  •  
27 Units of 3 Storey Shop Office on Part of Lot 47, Section 90A, Jalan Pudu Ulu, Daerah Wilayah Persekutuan (163c )
  •  
Major Infrastructure Work on Part of Lot 47, Section 90A, Jalan Pudu Ulu, Daerah Wilayah Persekutuan (163cvl )
  •  
Renovation project for a hypermarket operator (occupant) usage at an existing building Plaza 393, Di Atas lot 393, Seksyen 90, BT. 2 1/2, Jalan Cheras, Kuala Lumpur. (152r )
B. On-going project (at contruction stage):
  •  
20 Storey Low Cost, Setapak (1900 units, RM 75 million) (125) 
  •  
21 Storey Service Apartment, Port Diskson (RM 49 million) (156) 
  •  
Bungalow developement for 42 land lots and 4 types of bungalow at Mukim Setapak, Wilayah Persekutuan. (170 )
  •  
Kolej Keris, Universiti Kebangsaan Malaysia consists of 15 blocks of students hostel, administration building and public facility at Mukim Kajang, Selangor.(146 )
  •  
State Structure Plan Study (2002-2020) for Negeri Sembilan on Infrastructure and Utilities Sector.(178 )
  •  
24 storey commercial building consists of 5 apartment towers (900 units) and 1 office tower on 7 storey podium (2 floor shops, 4 floor carpark and 1 facility floor) at Daerah Petaling, Selangor Darul Ehsan.(RM 186 million) (185 )
C. On-going project (at design/planning stage):
  •  

22 Storey condominium (250 units) consists of 2 tower on a 4 storey carpark & facility floor podium at Daerah Petaling, Selangor Darul Ehsan.(180) 

Ad-here
Contry Height Holding Berhad

SY Perunding Sdn. Bhd. All Rights Reserved. [Privacy policy]  [Term of use]

Address: 16, Jalan SS3/31, 47300 PETALING JAYA, Selangor, Malaysia. Email: syp@po.jaring.my

If encounter any problem viewing this page or there is any comment, please email to us at syp@po.jaring.my

or call us at 603-78774470 during office hour