Last update: 15 Jan.2001 |
|
![]() |
This is a local plan study project for Pendamaran, Klang under the administration of Majlis Perbandaran Klang (MPK) with the collaboration of Pejabat Projek Kuala Lumpur, Jabatan Perancang Bandar dan Desa (JPBD). The local plan study is for a 13-year period from 1998 till 2010. The Pendamaran Study Area is located in Mukim Klang, Daerah Klang, Selangor covering an approximate area of 4,850 hectares. The overall study will be based on the Rancangan Struktur Klang (1986-2005) and to be governed by the Akta Perancangan Bandar & Desa 1976 and Akta Perancangan Bandar & Desa (Pindaan) 1995. |
Client: |
|||
Majlis Perbandaran KlangPejabat Projek Kuala Lumpur, Jabatan Perancang Bandar & Desa |
|||
Consultant Study Team |
|||
| Townscape & Town Centre | : | Mazlan Planning Consultants | |
| Landuse, Housing & Public Facilities | : | Perunding Alam Rancang Sdn Bhd | |
| Economy | : | PE Research Sdn Bhd | |
| Demography | : | MSC Planning Consultants | |
| Infrastructure & Utilities | : | SY Perunding | |
| Transport | : | Perunding Trafik Klasik | |
| Environment | : | Dr Ong Hean Chow (Institute of Biological Science, Universiti Malaya) | |
| Recreation & Landscape | : | Eastern Interest Sdn Bhd | |
| Management & Implementation | : | Albakri & Associates | |
Field of study |
|
The consultant study team consists of 9 sub-consultants specialising in different fields of study. We are responsible for the study of infrastructure and utilities comprising of the following sectors:- |
| Drainage | Sewerage | Water Supply | ||
| Electricity | Garbage Disposal System | Telecommunication | ||
| Piped Gas Utility |
The study methodology consistsof 3 stages, namely:- |
||
| - | Preliminary Report includes the scope of study, data source and type of output to be produced | |
| - | Technical Report includes the study of existing condition, projected growth of development, services demand and to identify problems or issues | |
| - | Local Plan Draft comprising the written statement on the issues encountered and the proposed solutions as well as the written guidelines stating the policies, acts, by-laws or other authorised guidelines to be adhered to by any recommendations proposed | |
The project was started in April 1998, and the Local Plan Draft was finalised in October 1999 |
|
|
||||||||||||||