SY Perunding Logo

Date:6 Feb.

Last update: 25Aug.2006

Cadangan Membina sebuah Bangunan Komersil, di atas sebahagian Lot PT 27, H.S.(D) 39382 dan sebahagian Lot PT 16728, H.S.(D) 59900, Mukim Petaling, Daerah Petaling, Selangor Darul Ehsan untuk Tetuan Mines Golf Resort Berhad.
(Construction cost – RM186 Millions)

I_Proj0185_240x168_03.GIF (23299 bytes)

Overall view of the project model

Developer:

Mines Golf Resort Berhad

Project Manager:

Emerging Transform Sdn. Bhd.

Architect:

Arkitek Ooi

C&S Engineer

SY Perunding

M & E Engineer:

EAB Consulting Engineers Sdn. Bhd.

Quantity Surveyor:

THL Consultants

Substructure Contractor:

Diam Makmur SB / IJM Construction Sdn. Bhd.

Superstructure Contractor:

Gadang Engineering (m) Sdn. Bhd.


This development consists of Podium Block with 2 floor of commercial floor and 4 floors of car-parks forming the base for 5 block of 24 storey service apartment (900 units) and 1 block of 15 storey Office. On the side is 1 block of 6 storeys shop. It is located at Lot PT27, H.S.(D) 39382 and part of lot PT 16728, H.S.(D) 59900, Mukim Petaling, Daerah Petaling. The development site covers an area of approximately 3.861hectare (9.54 acre).

The substructure works for the project commenced on February 2004 and the superstructure works commence on August 2004.

The foundation system uses time proven driven piles. Very high concrete grade spun pile is used instead of normal reinforced concrete piles. Concrete Grade 80 is used compared with normal grade 45. The pile size used is as big as 600 dia and there are more than 2600 number of pile points. The piles were extensively tested by present market standard. All together, 176 number of load tests have been carried out to verify the piles capacity.

The superstructure system is of reinforced concrete structural framing where all columns, beams and slabs are ‘fusing’ (monolithic) together. This building is designed to withstand wind speed of at least 108 km/h. Each column shape in apartment unit has been thoroughly studied for convenient to the resident without sacrificing the structural requirement. To facilitate change in layout, reinforced concrete slab is designed to carry brick wall on it and no inflexible structural partition wall is introduced, while the typical slab thickness is controlled at 125mm. Transfer floor is introduced at 7th Floor for transferring the “long” rectangular shape column from apartment into more square columns at lower floor, which is optimised for carpark arrangement. The 2m deep-transferred beams is chosen to be located on the same level with the swimming pool floor, at different position, for optimising the floor height usage.

For maximising the area usage, the required water storage for the project is stored in an underground water tank with car parking on top. The water retaining reinforced concrete underground water tank with the maximum depth of 2.75m is designed with shallow raft foundation without requiring any pile.

The earthwork platform level has been carefully designed to facilitate internal drainage and sewerage flow using gravity system, while complying to the client requirement to have a lowest possible platform level to achieve the least level different with the existing lake water level. All the rainwater runoff from the building plinth area is designed to discharge into the adjacent big pond in order to minimize discharge into existing drainage system.

I_Proj0185_360x167_04.GIF (20761 bytes) I_Proj0185_200x106_05.GIF (13776 bytes)

Main building work under construction

Artistic impression on canal within building


Ad-here
Contry Height Holding Berhad

SY Perunding Sdn. Bhd. All Rights Reserved. [Privacy policy]  [Term of use]

Address: 16, Jalan SS3/31, 47300 PETALING JAYA, Selangor, Malaysia. Email: syp@po.jaring.my

If encounter any problem viewing this page or there is any comment, please email to us at syp@po.jaring.my